Severn Trent

A stunning and original design statement

Location: Severn Trent Water, Operations Centre, Coventry
Architect: Webb Gray
Polished Plaster Selector Range Spatulata

PROJECT

Severn Trent Water’s new £60m operations centre in Coventry, which aims to set new industry standards with one of the lowest carbon footprints for any UK office building, incorporates equally eco-friendly Armourcoat polished plaster.

Designed by Birmingham-based Webb Gray Architects, and built by BAM Construction, this highly-sophisticated energy efficient building featuring the latest eco-technology. Designed for low-energy and low-carbon consumption, the offices include thermal adaptive cooling, biomass boilers, photovoltaic panels, solar panels and rainwater harvesting; justifiably achieving a BREEAM ‘excellent’ rating.

Armourcoat polished plaster was used within the reception and main atrium space, to create a stunning and original design statement. Totaling nearly four hundred square metres of hand-applied decorative plaster, Webb Gray specified colourfade artwork for feature panels and curved walls using the finish Spatulata. For the 30-metre high atrium panels, artisan plasterers blended over seventy colours of paste to achieve the seamless finish. Known as ‘stucco lustro veneziano’, Spatulata is a superfine stucco paste that is trowel applied in a series of fine layers to create a highly polished decorative surface. In keeping with the eco specification, the product contains 40% pre-consumer recycled marble.

This website uses cookies

We use cookies to improve your experience and to provide us with insight into how people use our website.