Loading...

Severn Trent Centre

Severn Trent Operation Centre

Severn Trent Water’s new £60m operations centre in Coventry, which aims to set new industry standards with one of the lowest carbon footprints for any UK office building, incorporates equally eco-friendly Armourcoat polished plaster.
 
Designed by Birmingham-based Webb Gray Architects, and built by BAM Construction, this highly-sophisticated energy efficient building featuring the latest eco-technology.  Designed for low-energy and low-carbon consumption, the offices include thermal adaptive cooling, biomass boilers, photovoltaic panels, solar panels and rainwater harvesting; justifiably achieving a BREEAM ‘excellent’ rating.
 
Armourcoat was used within the reception and main atrium space, to create a stunning and original design statement.  Totaling nearly four hundred square metres of hand-applied decorative plaster, Webb Gray specified colourfade artwork for feature panels and curved walls using Armourcoat Spatulata.  For the 30-metre high atrium panels, artisan plasterers blended over seventy colours of paste to achieve the seamless finish.  Known as ‘stucco lustro veneziano’, Spatulata is a superfine stucco paste that is trowel applied in a series of fine layers to create a highly polished decorative surface.  In keeping with the eco specification, the product contains 40% pre-consumer recycled marble.
 
The project also included the use of ‘Anti-Crack’ - an innovative substrate preparation system from Armourcoat which ensures fast-track construction and a tough, unrivalled backing for Armourcoat polished plaster wall finishes.  This cost effective, skim-coat plaster is designed for application in 3-4mm layers over plasterboard surfaces.  Its use eliminates the need for taping, jointing and sealing the plasterboard surface and provides a first class substrate for Armourcoat finishes.